Little's Law
Links average work in a system to its throughput rate and the average time each item spends inside.
Helps with
- estimating how long work takes to get through
- how work in progress affects lead time
- estimating stock or queue size from flow
- working out lead time from throughput
Use it when
Estimating lead time, inventory or capacity in a stable process.
The parts
- L: average items in the system
- λ: average arrival (throughput) rate
- W: average time in the system
- L = λW
Watch out
It holds for long-run averages in a stable system, not for individual items or a process that is still filling or draining.