Control Chart (SPC)
Plots a process measure over time against control limits to separate routine from unusual variation.
Helps with
- not sure if a process is stable
- telling normal variation from real problems
- checking whether a process change worked
- process results keep fluctuating
Use it when
Monitoring whether a process is stable before or after changing it.
The parts
- Measure plotted over time
- Centre line (process average)
- Upper control limit
- Lower control limit
- Common vs special causes
Watch out
Control limits come from the process's own variation, not from customer specifications, and the two are often confused.
Where it comes from
Shewhart first sketched a control chart in an internal memo dated 16 May 1924; the 1926 article is its first journal publication, and his 1931 book set out the full theory.